Selected Technique:
Stone Columns with Vibroflot
Project key figures:
206 Vibro Replacement Dry Bottom Feed Stone Columns
3380lm of Stone Columns
The Fraser Surrey Docks was constructing a new temporary office building.
Ground Conditions
The site’s subsurface stratigraphy consisted of the following:
- Approx. 2m of compact to medium dense sand fill with some silt and gravel;
- Underlain by 11m of soft to firm silty clay/silty sand;
- Underlain by 7m of medium to dense sand susceptible to liquefaction.
Groundwater was encountered at approximately 2m from the ground surface.
Menard Canada Solution
Vibro Replacement Stone Columns densification was required beneath the new building in order to prevent settlement caused by soil liquefaction in the event of an earthquake.
Menard Canada utilized dry-bottom-feed stone column installation techniques, which was the preferred method of the General Contractor. Stone Columns were installed at 20m depth on a regular grid pattern and 13m in between stone columns to meet the specified CPT tip resistance performance-based requirements.
Densification work began with an initial trial area consisting of 20 stone columns to assess the effectiveness of the proposed methods and stone column spacing. Production work applied similar methodologies to those proven successful in the trial area.

Fraser Surrey Docks – Surrey, British Columbia
Other projects
Whitby Toyota: Commercial Building Addition, Ontario
Oceanfront Park development, Squamish, British Columbia
Fire Station: Contrecoeur, Quebec
Extension d’usine: Plessisville, Quebec
Airport Building: Boul. Bagotville, Quebec
Warehouse: Coteau-du-Lac, Quebec
Student Residence, Mc Master University: Hamilton, Ontario
University of Toronto – Innis College Addition, Toronto, Ontario
Birchley Park, Residential Housing – Toronto, Ontario
Tkemlups Grocery Store, Kamloops, British Columbia
U-Haul Storage Centre, Prince George, British Columbia
Metro Warehouse: Terrebonne, Québec
Multi-Housing: Saint-Charles-Borromée, Québec
Residential Housing: Répentigny Québec
Rosefellow Industrial Building: Beauharnois, Québec
Manufacturing Facility: Val d’Or, Québec
Fruit d’Or Processing Plant: Plessisville, Québec
Residence: Sainte-Anne-des-Monts, Québec
Communications Tower-Videotron: Rigaud, Québec
Warehouse CANAC: Saint-Nicolas, Québec
Commercial Buildings: Pont Rouge, Québec
Residential Housing: Trois-Rivières, Québec
Acéricole Warehouse: Plessisville, Québec
Multiuse Building: Laval, Québec
Government Buildings: Shawinigan, Québec
Manufacturing Plant, Innomalt: Bécancour, Québec
Oceanfront Park Phase A: Squamish, British Columbia
Waste Water Treatment Plant: Vancouver, British Columbia
CP Rail, Coquitlam: British Columbia
Highway 91-17: Delta, British Columbia
West Calgary Ring Road: Calgary, Alberta
Road 389 Upgrade: Baie Comeau, Québec
Deltaport Facility: Delta British Colombia
Maison des Aînés: Alma, Québec
School Building: Hamilton, Ontario
Val-ÉO Wind Turbines: St-Gédéon, Québec
Warehouse: Sorel-Tracy, Québec
Dike Upgrades: Delta, British Columbia
U of T Student Residence: Toronto, Ontario
Minette Substation: Kitimat, British Columbia
Hydro One Operations: Dunnville, Ontario
Evolution Mining: Red Lake, Ontario
Fraser Surrey Docks: Surrey, British Columbia
Industrial Building: Brantford, Ontario
Residential Development: Toronto, Ontario
Dam No. 5: Vancouver Island, British Columbia
Dike Upgrade: New Westminster, British Columbia
Hotel Development: Thunder Bay, Ontario
Drainage Pump Station Upgrade: Vancouver, British Columbia
Residential Subdivision: Whitby, Ontario
Water Treatment Plant: Chilliwack, British Columbia
Pumping Station: Richmond, British Columbia
YVR Airport: Richmond, British Colombia
Trans Mountain Expansion Project: Edmonton, Alberta
Canadian Malartic Mine: Malartic, Québec
Whale Tail Dike: Amaruq, Nunavut
VALE Nickel Mines: Sudbury, Ontario
Wesdome Kiena Mine: Val d’or, Québec
Hydro One Storage Facility: Dunnville, Ontario
Industrial Building: Bécancour Québec
Explore Other Projects
Discover all Menard Canada
Webinars about
Ground Improvement
Deepen your geotechnical knowledge with our expert-led sessions