Selected Technique: Controlled Modulus Columns Treatment Area: 4839m² Following its alternative proposal to the piles, Menard Canada received the mandate from Deric Construction. to carry out soil improvement for the construction of a future Quebec-QSL Stevedoring multipurpose warehouse. The solution of Controlled Modulus Columns (CMC) [...]
Dike Upgrades: Delta, British Columbia
Menard Canada2023-05-02T23:02:38+02:00Selected Technique: Stone Columns with Vibroflot Treatment Area: Mob/demob.: 3 u Primary SC (28.5m): 845 u Secondary SC (13m): 429 u The proposed development of the dike involved the installation of stone columns and timber piles to densify the 4200m2 (12m wide section running for [...]
U of T Student Residence: Toronto, Ontario
menardcanadainc2023-11-15T21:25:40+01:00Selected Technique: Rapid Impact Compaction The project involved constructing a new student residence building for the University of Toronto Scarborough Campus. The new, six-storey structure is located along Ellesmere Road in Scarborough, ON. Due to the existing soil conditions, ground improvement was required to guarantee settlement [...]
Minette Substation: Kitimat, British Columbia
Menard Canada2023-11-15T21:50:00+01:00Selected Technique: Wick Drains Treatment Area: 39400m Horizontal Placement of Wick Drains Project Depth: 25m Minette Substation project was part of the expansion of the existing substation located in Kitimat, BC. Menard was awarded the site preparation package for the expansion of the substation. [...]
Warehouse: Calgary, Alberta
menardcanadainc2023-11-16T17:26:35+01:00Selected Technique: Controlled Modulus Columns Project: 3300 Columns A 4-level warehouse located within the South Dufferin Industrial park in Calgary was approved to support a supply chain facility. Ledcor was contracted to design and construct the warehouse, which included a 65,000m2 warehouse, large docking areas, [...]
Hydro One Operations: Dunnville, Ontario
Menard Canada2023-05-02T23:07:05+02:00Selected Technique: Wick Drains Treatment Area: 2964 Points Project Depth: 15-18m Magil Construction Ontario Inc. tasked Menard Canada with the design, supply, and installation of Vertical Wick Drains (VWD) for the Operations Centre and Storage Building as part of the Hydro One Networks Inc. [...]
Evolution Mining: Red Lake, Ontario
Menard Canada2023-11-16T17:16:48+01:00Selected Technique: Wick Drains Treatment Area: 100 000m Menard was awarded by Golder Associates on behalf of Evolution Mining for the soil improvement of an existing tailing pond for the support of a 15m+ dam embankment. The proposed solution of Wick Drains was installed over [...]
Fraser Surrey Docks: Surrey, British Columbia
menardcanadainc2024-05-20T21:53:43+02:00Selected Technique: Stone Columns with Vibroflot Project key figures: 206 Vibro Replacement Dry Bottom Feed Stone Columns 3380lm of Stone Columns The Fraser Surrey Docks was constructing a new temporary office building. Ground Conditions The site’s subsurface stratigraphy consisted of the following: Approx. 2m of [...]
Industrial Building: Brantford, Ontario
Menard Canada2023-05-02T23:10:05+02:00Selected Technique: Vibro Concrete Columns Treatment Area: 60 Columns As part of the redevelopment of a former gravel pit/quarry facility, Vicano Development planned the construction of a new industrial building in Brantford, Ontario. Unsuitable soils were identified for a portion of the proposed industrial structure [...]
Residential Development: Toronto, Ontario
menardcanadainc2023-05-02T22:45:02+02:00Selected Technique: Controlled Modulus Columns Project: 2000 CMCs As part of the Humber River Hospital site redevelopment, The Daniels Corp. planned to construct a series of residential buildings over a shared parking structure. Due to the presence of unsuitable fill materials on-site, ground improvement was [...]