Selected Technique: Vibro Stone Coloumns & Dynamic Compaction Treatment Area & Maximum Depth (Vibro Stone Coloumns): 4,100 m² & 20m Treatment Area & Maximum Depth (Dynamic Compaction): 2,900 m² & 18m The Oceanfront Park development was planned to be constructed at the end of [...]
CP Rail, Coquitlam: British Columbia
menardcanadainc2023-05-02T22:47:42+02:00Selected Technique: Bi-Modulus Columns / Vertical Drains Project: 1355 Columns Canadian Pacific Rail (CP) was planning to make track alignments in its Sapperton Yard located in the Westminster Subdivision of Coquitlam, British Columbia. In order to provide the necessary bearing capacity, control settlements, and meet [...]
Highway 91-17: Delta, British Columbia
menardcanadainc2023-05-02T22:48:59+02:00Selected Techniques: Stone Columns with Vibroflot / Dynamic Compaction / Vertical Drains Treatment Area: 12500m2 - Stone Columns 2331m2 - Dynamic Compaction 16000m2 - Wick Drains The British Columbia Ministry of Transportation and Infrastructure, South Coast Region, proposed to upgrade the existing Highway 91, Highway [...]
West Calgary Ring Road: Calgary, Alberta
menardcanadainc2023-11-16T16:16:17+01:00Selected Technique: Vertical Drains Project: 1800 of Vertical Drains Project Depth: 14-20m Calgary Safelink Partners, a Joint Venture between Carmacks Enterprises Ltd., Graham Infrastructure LP, and VINCI Infrastructure Canada, was building a portion of the West Calgary Ring Road from Highway 8 to Old [...]
Road 389 Upgrade: Baie Comeau, Québec
menardcanadainc2023-05-02T22:51:07+02:00Selected Technique: Vertical Drains Treatment Area: 4000m2 Project Depth: 14-20m As part of the improvement of Route 389 in Baie-Comeau, it was planned to install a surcharge to consolidate the underlying soft clays. The installation of Vertical Drains and surcharges was required between chainings [...]
Deltaport Facility: Delta British Colombia
menardcanadainc2023-11-16T17:10:59+01:00Selected Technique: Stone Columns Project: 50 units Project Depth: 8.5m Port Metro Vancouver was to construct a truck staging area at the intersection of Highway 17A and Deltaport Way to support operations at Deltaport. Ground improvement was selected for this project to maintain design [...]