Selected Technique: Dynamic Compaction Treatment Area: 7380m2 Dam Length: 740 Project Depth: 3-14m Following the discovery of a gold deposit in Amaruq, located 200 km away from Baker Lake, NU, Agnico Eagle Mines needed to construct a dike approximately 800 meters long to [...]
VALE Nickel Mines: Sudbury, Ontario
menardcanadainc2023-11-16T16:35:09+01:00Selected Techniques: Stone Columns Vertical Drains Treatment Area: 35,000m² Project Depth: 4-8m The Upper Pond Dam Remediation project was completed for VALE Nickel Mines in Sudbury, Ontario. The project consisted of the installation of Stone Columns with Wick Drains at intermediate points between the [...]
Wesdome Kiena Mine: Val d’or, Québec
menardcanadainc2023-11-23T11:25:17+01:00Selected Techniques: Deep Soil Mixing Stone Columns Treatment Area: 9,050m² Project Depth: 10-18m Menard Canada was approached to improve the stability of the dam slopes for the Kiena gold mine, located in Val d’Or, Qc. The main aim of this project is to increase [...]
Hydro One Storage Facility: Dunnville, Ontario
Menard Canada2023-05-02T22:14:22+02:00Selected Technique: Wick Drains Treatment Area: 14500 m² Project Depth: 18m Menard was awarded this project by Magil Construction on behalf of the client Hydro One for the soil improvement of a site for developing a operations and storage building. The proposed solution of [...]
Industrial Building: Bécancour Québec
Menard Canada2023-05-02T22:06:47+02:00Selected Technique: Dynamic Compaction Treatment Area: 17544m Project Depth: 8m Frare Gallant hired Menard Canada to improve the sites soil utilizing the Dynamic Compaction technique under the influence of the foundations of the various construction phases of the Innomalt project located on Jean Demers [...]