Selected Techniques: Wick Drain and Preload Program Treatment Area: Surface area ~17,000m² Wick Drains ~ 2,000 Project Depth: up to 27.5mBGS This project involves the construction of a large recreational complex including 3 hockey rinks, two pools, and other accommodations. The footprint of the [...]
Student Residence, Mc Master University: Hamilton, Ontario
Menard Canada2024-09-06T23:05:37+02:00Selected Technique: Controlled Modulus Columns (CMCs) Elements Installed: 753 Unit(s) CMCs The McMaster Main Street Undergraduate Residence project involved the construction of an up to 15-storey plus mechanical penthouse residential structure located at 1190 Main Street West, Hamilton, Ontario. The undergraduate residence, named after the [...]
Residential Housing: Trois-Rivières, Québec
Menard Canada2023-11-16T17:05:19+01:00Selected Technique: Dynamic Compaction Project Area: 2 100 m² As part of the construction of a 4-storey housing building located rue des Loyaux in Trois-Rivières, the estimate revealed that Dynamic Compaction to improve the soils in place as an alternative to the preloading solution would prove to [...]