Selected Techniques: Phase 1: Wick Drain and Preload Program Phase 2: Controlled Modulus Columns (CMCs) Treatment Area: Surface area ~17,000m² Wick Drains ~ 2,000 1,550 Unit(s) CMCs Project Depth: up to 27.5mBGS This project involves the construction of a large recreational complex including 3 [...]
Warehouse: Vars, Ontario
jenniferlemarec2024-09-06T16:46:02+02:00Selected Technique: Controlled Modulus Columns Treatment Area: ~6,000m² Project Depth: 6m The development consisted of a multi-unit 1-storey warehouse approximately 6,630m2 with 10 loading docks in Vars, Ontario. The warehouse was designed for a 20 kPa slab load. Vars, Ontario [...]

Student Residence, Mc Master University: Hamilton, Ontario
Menard Canada2024-09-06T23:05:37+02:00Selected Technique: Controlled Modulus Columns (CMCs) Elements Installed: 753 Unit(s) CMCs The McMaster Main Street Undergraduate Residence project involved the construction of an up to 15-storey plus mechanical penthouse residential structure located at 1190 Main Street West, Hamilton, Ontario. The undergraduate residence, named after the [...]