Waste Water Treatment Plant: Vancouver, British Columbia

Project Overview

The project included the design, build, and construction of the new NSWWTP, which was to have state-of-the-art secondary treatment and energy recovery facilities. The new plant was to be built to LEED standards on a very compact site. Much of it was to be buried underground. Its design also incorporated energy efficiency and recovery solutions, water conservation and reuse, on-site stormwater management, and measures to minimize waste generation.

Selected Technique

Stone Columns with Vibroflot

Treatment Area

100,879lm

Project Depth

29m

Menard Canada Installing Stone Columns with Vibroflot

Ground Conditions

The subsurface conditions on-site typically consisted of:

  • A 1 m to 3 m thick upper granular Fill
  • Underlain by a 5 m to 8 m thick generally compact Upper Gravel, Sand, and Cobbles layer.
  • Underlain by 3 m to 5 m of interbedded Silt, Sand, and Clayey Silt, loose to compact and significantly compressible.
  • Underlain by a lower Gravel, Sand, and Cobbles layer up to a depth of 14 m to 19 m
  • Underlain by Sand down to a depth of 30 m to 45 m approximately.

Menard Canada Solution

Ground improvement was carried out using Vibro-replacement (Stone Columns) using wet top feed methods to 29 m depth below the average existing site grade. Ground improvement is intended to mitigate seismically induced soil liquefaction potential and minimize post-seismic settlements and lateral movements of structures. Full-depth pre-drilling of every column was required to allow penetration of the Vibro probe.