{"id":9114,"date":"2022-08-16T19:54:58","date_gmt":"2022-08-16T17:54:58","guid":{"rendered":"https:\/\/menardcanada.ca\/?post_type=avada_portfolio&p=9114"},"modified":"2023-11-15T21:50:00","modified_gmt":"2023-11-15T20:50:00","slug":"minette-substation","status":"publish","type":"avada_portfolio","link":"https:\/\/menardcanada.ca\/soil-expert-portfolio\/minette-substation\/","title":{"rendered":"Minette Substation: Kitimat, British Columbia"},"content":{"rendered":"
Selected Technique:<\/span> Treatment Area: Project Depth:<\/span> Minette Substation project was part of the expansion of the existing substation located in Kitimat, BC. Menard was awarded the site preparation package for the expansion of the substation.<\/p>\n
\n<\/span>Wick Drains<\/b><\/span><\/p>\n
\n<\/div>
\n<\/span><\/span>39400m Horizontal Placement of Wick Drains<\/b><\/p>\n
\n<\/div>
\n<\/span>25m<\/b><\/span><\/p>\n
\n<\/div>Ground Conditions<\/h3>\n
\n\u2022 Fibrous and highly compressible peat layer to a depth of 2m with almost 100% moisture content
\n\u2022 Underlaying sand and gravel to a depth of 3m
\n\u2022 Underlaying interlayered, very soft clayey silt to a max. depth of 13m
\n\u2022 A layer of fine sand overlying a strong bedrock at approx. 25m depth