{"id":9099,"date":"2022-08-16T19:49:39","date_gmt":"2022-08-16T17:49:39","guid":{"rendered":"https:\/\/menardcanada.ca\/?post_type=avada_portfolio&p=9099"},"modified":"2023-11-16T17:26:35","modified_gmt":"2023-11-16T16:26:35","slug":"yyc4-project-maverick-warehouse-calgary-alberta","status":"publish","type":"avada_portfolio","link":"https:\/\/menardcanada.ca\/soil-expert-portfolio\/yyc4-project-maverick-warehouse-calgary-alberta\/","title":{"rendered":"Warehouse: Calgary, Alberta"},"content":{"rendered":"
Selected Technique:<\/span> Project: A 4-level warehouse located within the South Dufferin Industrial park in Calgary was approved to support a supply chain facility. Ledcor<\/a> was contracted to design and construct the warehouse, which included a 65,000m2 warehouse, large docking areas, heavy parking, light parking, and few access roads. The engineer recommended stone columns as a ground improvement solution, but Menard Canada\u2019s Design and build team proposed Controlled Modulus Columns<\/a> (CMCs) to achieve the required bearing capacity, reducing the post-construction settlement. In addition, CMCs are cost-effective, swiftly operated with little vibrations, and generate nominal\/no spoil during execution.<\/p>\n The general subsurface stratigraphy consists of:<\/p>\n The groundwater table is at approximately 3m.<\/p>\n<\/div>\n
\n<\/span>Controlled Modulus Columns<\/b><\/span><\/p>\n
\n<\/div>
\n<\/span><\/span>3300 Columns<\/b><\/span><\/p>\n
\n<\/div>Ground Conditions<\/h3>\n
\n