{"id":9074,"date":"2022-08-16T19:37:05","date_gmt":"2022-08-16T17:37:05","guid":{"rendered":"https:\/\/menardcanada.ca\/?post_type=avada_portfolio&p=9074"},"modified":"2024-05-20T21:53:43","modified_gmt":"2024-05-20T19:53:43","slug":"fraser-surrey-docks-surrey-british-columbia","status":"publish","type":"avada_portfolio","link":"https:\/\/menardcanada.ca\/soil-expert-portfolio\/fraser-surrey-docks-surrey-british-columbia\/","title":{"rendered":"Fraser Surrey Docks: Surrey, British Columbia"},"content":{"rendered":"

Selected Technique:<\/span>
\n<\/span>Stone Columns with Vibroflot<\/b><\/span><\/p>\n


\n<\/div>

Project key figures:
\n<\/span><\/span>206 Vibro Replacement Dry Bottom Feed Stone Columns <\/b><\/p>\n

3380lm of Stone Columns
\n<\/b><\/p>\n


\n<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>

The Fraser Surrey Docks was constructing a new temporary office building.<\/p>\n

Ground Conditions<\/h3>\n
\n
\n
\n

The site\u2019s subsurface stratigraphy consisted of the following:<\/p>\n<\/div>\n