{"id":8964,"date":"2022-08-16T17:28:13","date_gmt":"2022-08-16T15:28:13","guid":{"rendered":"https:\/\/menardcanada.ca\/?post_type=avada_portfolio&p=8964"},"modified":"2023-11-16T16:43:20","modified_gmt":"2023-11-16T15:43:20","slug":"canadian-malartic-mine-malartic-quebec","status":"publish","type":"avada_portfolio","link":"https:\/\/menardcanada.ca\/soil-expert-portfolio\/canadian-malartic-mine-malartic-quebec\/","title":{"rendered":"Canadian Malartic Mine: Malartic, Qu\u00e9bec"},"content":{"rendered":"
Selected Technique:<\/span> Treatment Area: Project Depth:<\/span> As part of the expansion of the largest open-pit gold mine in Canada, the Canadian Malartic Mine will build a dyke over a length of 1km100 and reach a height of more than 20m compared to the current level of the natural ground to contain mining residues. Menard Canada was mandated by Norascon to install Vertical Drains<\/a> through the soft clay on two sectors of the dike. The improved right-of-way totalled 375m in length by 45m in width.<\/p>\n Menard Canada installed over 7000 vertical Wick Drains in a mesh <\/span>pattern across the footprint of the new dam. <\/span>Installation was carried out over 24 hours\/day, <\/span>and over 120,000 linear meters of drains were <\/span>installed ahead of the client\u2019s schedule.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div><\/div><\/div>
\n<\/span>Vertical Drains<\/b><\/span><\/p>\n
\n<\/div>
\n<\/span><\/span>16,875m\u00b2<\/b><\/p>\n
\n<\/div>
\n<\/span>8-21m<\/b><\/span><\/p>\n
\n<\/div>Ground Conditions<\/h3>\n
\nMenard Canada Solution<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n