{"id":8915,"date":"2022-08-16T15:36:40","date_gmt":"2022-08-16T13:36:40","guid":{"rendered":"https:\/\/menardcanada.ca\/?post_type=avada_portfolio&p=8915"},"modified":"2023-05-02T22:14:22","modified_gmt":"2023-05-02T20:14:22","slug":"hydro-one-storage-facility-dunnville-ontario","status":"publish","type":"avada_portfolio","link":"https:\/\/menardcanada.ca\/soil-expert-portfolio\/hydro-one-storage-facility-dunnville-ontario\/","title":{"rendered":"Hydro One Storage Facility: Dunnville, Ontario"},"content":{"rendered":"
Selected Technique:<\/span> Treatment Area: Project Depth:<\/span> Menard was awarded this project by Magil Construction on behalf of the client Hydro One for the soil improvement of a site for developing a operations and storage building. The proposed solution of Wick Drains was installed over an average depth of 18m through the silty clay under the future facility. The project was located in Dunnville and was completed for the Hamilton BU.<\/p>\n Menard Canada Solution<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n
\n<\/span>Wick Drains<\/b><\/span><\/p>\n
\n<\/div>
\n<\/span><\/span>14500 m\u00b2<\/b><\/p>\n
\n<\/div>
\n<\/span>18m<\/b><\/span><\/p>\n
\n<\/div>Ground Conditions<\/h3>\n
\n
\n