{"id":10772,"date":"2022-08-16T16:58:50","date_gmt":"2022-08-16T14:58:50","guid":{"rendered":"https:\/\/menardcanada.ca\/soil-expert-portfolio\/innomalt-becancour-quebec-2\/"},"modified":"2023-11-16T16:32:31","modified_gmt":"2023-11-16T15:32:31","slug":"mines-vale-nickel-sudbury-ontario","status":"publish","type":"avada_portfolio","link":"https:\/\/menardcanada.ca\/fr\/soil-expert-portfolio\/mines-vale-nickel-sudbury-ontario\/","title":{"rendered":"Mines VALE Nickel : Sudbury, Ontario"},"content":{"rendered":"

Techniques s\u00e9lectionn\u00e9es :<\/span>
\n<\/span>Colonnes Ballast\u00e9<\/span>es
\nDrains Verticaux<\/b><\/span><\/span><\/p>\n


\n<\/div>

Zone de traitement\u00a0:
\n<\/span><\/span>35 000 m\u00b2<\/b><\/b><\/p>\n


\n<\/div>

Profondeur du projet :<\/span>
\n<\/span>4-8 m<\/b><\/span><\/p>\n


\n<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>

Le projet d\u2019assainissement du barrage de l\u2019\u00e9tang sup\u00e9rieur a \u00e9t\u00e9 r\u00e9alis\u00e9 pour Vale \u2014 anciennement Inco \u2014 Nickel Mines \u00e0 Sudbury, en Ontario. Le projet consistait en l\u2019installation de Colonnes Ballast\u00e9es<\/a> avec des Drains Verticaux<\/a> \u00e0 des points interm\u00e9diaires entre les colonnes de pierre. La solution a \u00e9t\u00e9 con\u00e7ue pour augmenter la r\u00e9sistance du sol derri\u00e8re le barrage sud afin de pouvoir installer un grand contrefort.<\/p>\n

Compte tenu des mauvaises conditions du sol existant sur le site, il a \u00e9t\u00e9 n\u00e9cessaire d\u2019am\u00e9liorer le sol pour permettre l\u2019installation de la berme de pied afin d\u2019augmenter le facteur de s\u00e9curit\u00e9 du barrage et de pr\u00e9venir les d\u00e9faillances potentielles.<\/p>\n

\n
\n
<\/div>\n
<\/div>\n<\/div>\n<\/div>\n
\n
\n
<\/div>\n<\/div>\n<\/div>\n<\/div><\/div><\/div>
<\/span><\/div>

VALE Nickel Mines, Sudbury, Ontario<\/em><\/p>\n<\/div>

<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/i><\/span>Contactez-nous d\u00e8s aujourd\u2019hui pour une \u00e9valuation gratuite de votre projet<\/span><\/a><\/div><\/div><\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
\n
\n
\n

Conditions de sol<\/h3>\n
\n
\n
Les sols \u00e0 am\u00e9liorer \u00e9taient constitu\u00e9s de r\u00e9sidus fins de limon produits par des machines. Avant le d\u00e9but des travaux, les sols de surface de la zone de travail ont \u00e9t\u00e9 excav\u00e9s entre deux et trois pieds, remplis de pierres concass\u00e9es et compact\u00e9es au rouleau pour supporter l\u2019\u00e9quipement lourd d\u2019am\u00e9lioration des sols. La profondeur de l\u2019am\u00e9lioration \u00e9tait d\u2019environ 4 \u00e0 8 m dans toute la zone.<\/p>\n<\/div>\n<\/div>\n<\/div>\n

La solution propos\u00e9e par Menard Canada<\/h3>\n<\/div>\n<\/div>\n<\/div>\n
\n
\n
\n

Les Drains Verticaux ont \u00e9t\u00e9 install\u00e9s avant les Colonnes Ballast\u00e9es pour faciliter la dispersion des pressions interstitielles excessives et de l\u2019air introduit dans le sol pendant l\u2019installation des colonnes de pierre. Les colonnes de pierre ont ensuite \u00e9t\u00e9 avanc\u00e9es entre les drains verticaux.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div><\/div><\/div><\/div><\/div>