{"id":10636,"date":"2022-09-23T12:05:28","date_gmt":"2022-09-23T10:05:28","guid":{"rendered":"https:\/\/menardcanada.ca\/?post_type=avada_portfolio&p=10636"},"modified":"2023-05-17T22:55:44","modified_gmt":"2023-05-17T20:55:44","slug":"amelioration-des-digues-delta-colombie-britannique","status":"publish","type":"avada_portfolio","link":"https:\/\/menardcanada.ca\/fr\/soil-expert-portfolio\/amelioration-des-digues-delta-colombie-britannique\/","title":{"rendered":"Am\u00e9lioration des digues : Delta, Colombie-Britannique"},"content":{"rendered":"

Technique s\u00e9lectionn\u00e9e :\u00a0<\/span>
\n<\/span>Colonnes Ballast\u00e9es avec Vibroflot<\/b><\/span><\/p>\n


\n<\/div>

Zone de traitement :
\n<\/span><\/span>Mob\/demob. : 3 u
\nSC primaire (28.5m) : 845 u
\nSC secondaire (13m) : 429 u<\/b><\/p>\n


\n<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>

Le d\u00e9veloppement propos\u00e9 de la digue impliquait l’installation de Colonnes Ballast\u00e9es et de pieux en bois pour densifier la bande de 4200m2 (section de 12m de large courant sur 354m d’ouest en est) adjacente \u00e0 l’usine de GNL existante de FortisBC \u00e0 Delta, BC. La propri\u00e9t\u00e9 est d\u00e9limit\u00e9e par le fleuve Fraser au nord, un terrain commercial \u00e0 l’ouest et l’usine de GNL au sud.<\/p>\n

Conditions de sol<\/h3>\n
\n
\n
Les conditions souterraines comprennent des couches sup\u00e9rieures intercal\u00e9es de limon sableux et de limon argileux (jusqu’\u00e0 une profondeur de 13 m) avec des traces de bois et de mati\u00e8res organiques et une couche de sable s’\u00e9tendant jusqu’\u00e0 une profondeur de 28,5 m. . La couche de sable est susceptible de se liqu\u00e9fier, ce qui compromet la stabilit\u00e9 de la digue. Une nappe d’eau souterraine a \u00e9t\u00e9 rencontr\u00e9e \u00e0 environ 3,0m sous la surface du sol.<\/div>\n
\n
\n
\n
<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n
\n
\n
<\/div>\n<\/div>\n<\/div>\n<\/div><\/div><\/div>
<\/span><\/div>

Colonnes Ballast\u00e9es\u00a0avec Vibroflot en cours d’installation<\/em><\/p>\n<\/div>

<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/i><\/span>Contactez-nous d\u00e8s aujourd\u2019hui pour une \u00e9valuation gratuite de votre projet<\/span><\/a><\/div><\/div><\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
\n
\n
\n
\n
\n
\n

La solution propos\u00e9e par Menard Canada<\/h3>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n
\n
\n
\n

La solution retenue a finalement consist\u00e9 en une combinaison de Colonnes Ballast\u00e9es Vibro \u00e0 28,5 m de profondeur, utilisant la m\u00e9thode Wet Top Feed, et des pieux en bois \u00e0 13 m de profondeur.<\/p>\n

Le sable plus profond a r\u00e9agi plus facilement et plus efficacement au traitement Vibro que la couche sup\u00e9rieure. Apr\u00e8s l’ach\u00e8vement de la zone d’essai, il a \u00e9t\u00e9 d\u00e9cid\u00e9 de construire des SC suppl\u00e9mentaires \u00e0 13 m de profondeur, \u00e0 un centro\u00efde sur deux, afin de respecter la r\u00e9sistance CPT sp\u00e9cifi\u00e9e.
\nLe TP, sous-trait\u00e9 \u00e0 un entrepreneur local, FRPD, devait assurer la stabilit\u00e9 lat\u00e9rale de la digue en cas de tremblement de terre. Ils ont \u00e9t\u00e9 enfonc\u00e9s le long de la face nord de la zone d’am\u00e9lioration du sol \u00e0 chaque centro\u00efde de la maille SC.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div><\/div><\/div><\/div><\/div>