Pont sur la Route 175

Guillaume Atténuation de la liquéfaction, Capacité portante et contrôle du tassement, Colonnes ballastées, Transport et infrastructures

Project Overview Ministère des Transports du Québec contracted Excavation Chicoutimi Inc. to build two overpass bridges on Talbot boulevard (Road 175) in Stoneham. Menard Canada was awarded the soil improvement works under the future bridges. Vibro-replacement was selected as the appropriate technique based on the existing soil conditions. Provided Solution Menard Canada proposed a Vibro Replacement top feed method for …